Phoenix Testlab has one of the best equipped laboratories for environmental simulation tests for railway applications. From train noses to AC systems and pantographs – our laboratory and its expert team are always ready to deal with your test objects.
Rail - environmental simulation
Accreditations:
DIN EN ISO/IEC 17025:2005
Certifications:
DIN EN ISO 9001:2015 and
DIN EN ISO 14001:2015
- Accredited for tests on electronic components for railway applications
- DIN EN 50155 railway applications
- DIN EN 61373 vibration tests for railway applications
- DIN EN 60068-2-6 (sine vibration test)
- DIN EN 60068-2-2 (climatic test)
- DIN EN 60068-2-14 (rapid change in temperature)
Electrodynamic oscillation systems (option: with temperature/climatic testing)
- Class 1: 20 kN - 35 kN
- Class 2: 55 kN
- Class 3: 105 kN
- Class 4: 200 kN
- Temperature and climate cabinets: (0.5 m³ to 2 m³), option: sunlight, noxious gas
- Temperature and climate chambers (accessible): (4.5 m³ to 24 m³), option: sunlight
- Shock cabinets: air/air (on request: climate option)
- Class 1: 120 l
- Class 2: 500 l
- Class 3: 7 m³
- Corrosion changeover troughs: 0.5 m³ - 1 m³
- Corrosion changeover chambers:
- Class 1: 1 m³
- Class 2: up to 3 m³
- Class 3: 11 m³
- IP degree of protection test
- Dust chamber (DIN EN 60529)
- Wet room (area of 25 m²)
- Inflammability test stand
- Electrical tests: high-voltage and insulation test, parameter tests
- Monitoring systems for test object monitoring and control (contact monitoring, actuation equipment, electronic loads, etc.)
Monitoring systems
Test object control and monitoring systems; electric, pneumatic, and mechanical tests are performed at Phoenix Testlab as part of Monitoring & Bench Design.
Customer-specific applications are part of our daily work. Phoenix Testlab uses proven elements for this task. Depending on the task, they are designed for a vibration test under temperature and climatic conditions or for a dedicated temperature change test.
Monitoring instruments are selected in close cooperation with our customers. Within a very short period of time, actuation equipment for locking systems (power window components) or electrical load change test stands for high-current consumers can be implemented, for example.